SandCastle long-term roadmap (E2E gate, npm package, port)
- Assignees
- Jad@jad
- Created
- 5/12/2026, 5:36:30 AM
- Source
sayso/meetings/2026-05-11-team-sync-action-items
Summary
Tracking the longer-term SandCastle directions surfaced in the May 11 sync. Not commitments — research / scoping items.
- Headless-Chrome E2E testing gate inside the sandbox. Add a verification stage where the pipeline's output is exercised end-to-end via headless Chrome before being accepted.
- Externalize as an npm package. Evaluate whether the pipeline can be published as a reusable npm package so it isn't tied to one repo.
- Port to other repos. Once externalized (or while doing so), port SandCastle to the other AZ repos that would benefit.
Done when: each of the three has a written go/no-go with a follow-up ticket if go.